Year 2024
Inspection (en Francais)
Sep 20, 2024
Year 2023
Proactive Compliance Inspection
Oct 19, 2023
Year 2022
Year 2021
Other Inspection
Dec 13, 2021
Year 2020
Critical Incident Inspection
Nov 04, 2020
Critical Incident Inspection
Sep 18, 2020
Year 2019
Critical Incident Inspection
Oct 02, 2019
Critical Incident Inspection with Order(s) of the Inspector
Apr 16, 2019
Critical Incident Inspection
Feb 08, 2019
Year 2018
Critical Incident Inspection
Nov 20, 2018
Resident Quality Inspection
Jul 13, 2018
Year 2017
Resident Quality Inspection
Apr 12, 2017
Year 2016
Complaints Inspection
Sep 23, 2016
Complaints Inspection
Jun 21, 2016
Resident Quality Inspection
Jun 16, 2016
Year 2015
Complaints Inspection
Nov 13, 2015
Complaints Inspection
Oct 08, 2015
Follow-Up Inspection
Sep 22, 2015
Follow-Up Inspection with Order(s) of the Inspector
Aug 18, 2015
Follow-Up Inspection
Aug 10, 2015
Complaints Inspection
Jun 22, 2015
Resident Quality Inspection with Order(s) of the Inspector
May 19, 2015
Critical Incident Inspection
Feb 17, 2015
Complaints Inspection
Jan 08, 2015
Complaints Inspection
Jan 08, 2015
Year 2014
Complaints Inspection
Nov 05, 2014
Complaints Inspection
Sep 16, 2014
Complaints Inspection
Sep 16, 2014
Complaints Inspection
Aug 11, 2014
Resident Quality Inspection
Jul 28, 2014
Complaints Inspection
Jul 28, 2014
Complaints Inspection
Jul 24, 2014
Complaints Inspection
May 08, 2014
Complaints Inspection
Feb 06, 2014
Year 2013
Complaints Inspection
Dec 20, 2013
Complaints Inspection
Jun 11, 2013
Critical Incident Inspection
Mar 25, 2013
Critical Incident Inspection
Feb 21, 2013
Complaints Inspection
Jan 11, 2013
Year 2012
Follow-Up Inspection
Oct 02, 2012
Complaints Inspection
Sep 13, 2012
Complaints Inspection
Jul 11, 2012
Complaints Inspection
Jun 07, 2012
Complaints Inspection
Jun 07, 2012
Complaints Inspection
Apr 12, 2012
How to interpret these results
This page displays the inspection reports that have been issued for the Long-Term Care home (LTCH) you selected.
Terms and Definitions
Licensee
The operator of a LTCH.
Inspections
Ministry of Long-Term Care (MLTC) inspectors conduct inspections at every LTCH at least once a year to determine compliance with the Fixing Long Term Care Act, 2021 (FLTCA) and Ontario Regulation 246/22 (Regulation).
Inspection Report
A summary of an inspection, including any findings of non-compliance, written by a LTCH Inspector.
Inspection Type
The ministry conducts unannounced inspections focusing on complaints, critical incidents, follow-ups, proactive compliance, and post-occupancy.
Complaint, Critical Incident and Follow-Up Inspections
-
LTCH inspectors visit long-term care homes to inspect on:
-
complaints received by a resident, family member, staff member or the public;
-
critical incidents that were reported by the LTCH;
-
follow-ups to a previously issued Compliance Order to ensure that the home has corrected the non-compliance.
Proactive Compliance Inspections
-
LTCH inspectors conduct proactive inspections using a standardized approach to identify any non-compliance with FLTCA and the Regulation. These inspections are a stand alone inspection and do not cover complaints, critical incidents, follow ups or post-occupancy, unless it is necessary.
-
Proactive Compliance Inspections were referred to as Resident Quality Inspections prior to 2019.
Post-Occupancy Inspections
-
LTCH inspectors conduct post-occupancy inspections after a newly built or redeveloped LTCH to ensure compliance with FLTCA and the Regulation. These inspections are usually conducted within two weeks after the last resident has moved in the LTCH.
Intake
Intakes are a record of the initial Complaint or Critical Incident that was received.
Inspection Protocols
-
Audit tools that may be used to inspect an issue in-depth and helps determine if a home is compliant with FLTCA and the Regulation.
Inspection Results
If a LTCH Inspector finds any non-compliance with FLTCA or the Regulation, a non-compliance action is issued under the Inspection Results section of the report, such as:
-
A low-risk instance of non-compliance that did not cause any harm or risk of harm to residents. Non-Compliance Remedied are issued when the non-compliance was rectified by the LTCH and verified by a LTCH Inspector during the inspection.
-
Issued for non-compliances with a low impact or risk to residents.
-
Issued when a Licensee has failed to comply with a requirement under FLTCA or the Regulation. Compliance Orders are:
-
Usually issued for non-compliances with a moderate to significant impact or risk to a resident’s health, safety, or quality of life.
-
Usually require certain action(s) the LTCH has to take in order to become compliant, e.g., developing a plan or training for staff
-
Always require a follow-up inspection.
Administrative Monetary Penalty
-
Issued when an LTCH:
-
Has not complied with a Compliance Order
-
Receives a Compliance Order and has had at least one other Compliance Order; for the same requirement within a three-year period; and
-
Receives a Compliance Order related to air conditioning requirements.
-
Issued when an LTCH is still non-compliant with a Compliance Order after a follow-up inspection.
-
When a LTCH Inspector refers a non-compliance to the Director for review.
Inspection Report Date
The date the LTCH Inspection Report was finalized by the Inspector.
Notification of Cease of Admissions
A directive from the Director to Home and Community Care Support Services to cease authorizing admissions to the LTCH for a specific period of time.
Lifting of Cease of Admissions
A directive from the Director to Home and Community Care Support Services to resume authorizing admissions to the LTCH for a specific period of time.